Taking reservations now! Build the home of your dreams with Sam and Nate Beiler, Beiler Home Builders, in the new community of Parkside, Phase 3 and Phase 5. Ideally located in the heart of Manheim Township adjacent to the Millpond neighborhood. Phase 5 building prices including the lot start at $750,000. Phase 3 building prices including the lot start at $1,250,000. The Westfield Model at $825,000 includes the price of a building lot in Phase 5. Floor plans available, start from scratch, or bring your own. If you can dream it, we can build it! Reidenbaugh Elementary School. Location is convenient to everything, including downtown Lititz and Lancaster.
PALA2056172
Single Family, Single Family-Detached, Traditional, 2 Story
4
MANHEIM TWP
LANCASTER
3 Full/1 Half
<1--
-->
Other, Gas Water Heater, Public Water Service
Other Construction
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...